12.12.020 Permit application procedures and fee.

A. Any person making application for such permit to move a structure in and onto any location within the town shall, before making the application for permit, or within ten days after making said permit application, cause all of the interior and exterior walls, ceiling and flooring to be removed to such extent as may be necessary and required for access to inspection by the Building Official for the purpose of ascertaining the materials and type of construction of such building or structure, and to enable a reasonable opportunity to determine and ascertain whether or not such building or structure does, in fact, comply with the applicable building codes and construction codes of the town.
B. Moving permits shall be issued to applicants only on written application disclosing the name of the owner of the building to be moved, the location from which it is proposed to be moved, the location to which it is proposed to be moved, the date of the proposed moving into the town, the name of the party in charge of effecting the transfer and movement and such further general information as the Building Inspector, the Police Department or the Town Engineer may require and upon the payment of an inspection fee as set forth in Section 3.32.010, together with such further deposit as appears necessary and reasonable for the purpose of reimbursing the Inspector’s cost of travel outside the town, if any, to any place where such building may be exposed to inspection for the purposes specified in this section.
C. The permit fee for installing a moved residential structure onto a new site, including the foundation, water hookup and the building drain connection, shall be as set forth in Section 3.32.010. (Ord. 04-447 § 1(part), 2004; Ord. 04-431 § 11, 2004; Ord. 98-344 § 1)